Building Integrity · Site Pass
Hillview Residence
Site induction

Hillview Residence

14 Hillview Crescent, Torquay VIC 3228 · Building Integrity
  • Takes about 3 minutes on your phone
  • Have your White Card (or Vic Red Card) ready
  • One induction covers you on this site for 12 months
  • Been on a Building Integrity site before? Your details carry over
  • Just visiting or dropping off? Shorter form — no card needed
This is a demonstration site — not a real project. Go through it and see exactly what a tradie sees at our gate. Nothing you enter here is used on a real job.

You must complete this induction before entering the work area. See Stuart if you have any trouble.

Step 1 of 6

Your details

You’re on site as
If you’ve been inducted on one of our sites before, this finds your details
Step 2 of 6

Construction induction card

Photo of induction cardCard photo attached
Step 3 of 6

A few questions

Your trade
First time on this site?
Will you do any of this today? tap all that apply — or None of these
Any medical conditions or allergies first aiders should know about?
Fit for work today — not affected by drugs, alcohol or fatigue?
Do you have the PPE for your tasks today? hi-vis, steel caps, eye and ear protection where posted
Step 4 of 6

Site rules & emergency info

  • Sign in every day you are on site — first visit is this induction, after that tell the supervisor
  • Site hours 7:00am–5:00pm Mon–Fri, 8:00am–1:00pm Sat
  • Report every incident, near miss and hazard to the supervisor the same day
  • No work outside your SWMS — if the work changes, come and see us first
  • Hard hat, hi-vis and safety boots at all times; eye and hearing protection as the work needs it
  • Both neighbours are living in — no radios, keep the shared driveway clear
  • Amenities and the first aid kit are in the site shed
  • Keep your work area clear and clean down daily — bins are provided, no burning off
In an emergency
Dial
000 — then call Stuart
Assembly point
Front verge, opposite the site shed
First aid
Site shed
Nearest hospital
University Hospital Geelong — 20 min
Site contact
Stuart · 0413 078 093
Site Safety Planv2
How this site runs — emergency plan, site hazards, and how safety is managed.
Open the Site Safety Plan
Step 5 of 6

Sign onto your SWMS

These are the Safe Work Method Statements covering work on this site.

Working at Heights — Roof Framing & Roof CoverApproved v2
Kestrel Roofing · approved 2026-04-16
Open and read the SWMS
Open the SWMS first — the tick unlocks after you’ve looked at it.
Demolition & Strip-Out — Existing DwellingApproved v1
Harborne Demolition · approved 2025-10-24
Open and read the SWMS
Open the SWMS first — the tick unlocks after you’ve looked at it.
Temporary Propping to Existing StructureApproved v1
Ironbark Structural · approved 2026-02-05
Open and read the SWMS
Open the SWMS first — the tick unlocks after you’ve looked at it.
On or Near Live Electrical — Switchboard & Rough-InAwaiting approval
Vantage Electrical · can’t be signed onto until Stuart approves it
Crane lifts / rigging — site-wideAwaiting approval
Building Integrity · can’t be signed onto until Stuart approves it
If your work changes and isn’t covered by an approved SWMS, stop and see Stuart.
Step 6 of 6

Sign to finish

I declare the information I’ve given is true, I’ve read and will comply with the site rules and the SWMS I signed onto, and I’ll report all hazards, incidents and near misses to the site supervisor.

Sign here with your finger

You’re inducted

Show this screen if Stuart asks.

Name
Company
Site
Hillview Residence
Inducted
Valid to
Record
Your induction is saved and on the site register. Have a safe one.

STOP — do not enter the work area

Your details are saved, but you are NOT cleared to start work.

Why:
    See management first
    See
    Stuart
    Call
    0413 078 093
    Record
    Once Stuart sorts this out you’ll be cleared on the register — you won’t need to redo the whole induction.